Concord is where the working floors are. The land between Keele and Dufferin is employment rather than housing, so most of what we are asked about here is a warehouse, a unit or a shop floor rather than a garage. Two things follow from that. The floor is usually a replacement rather than a first coating, and the cost that matters to you is rarely the quote. It is the hours the space cannot be used.

On a working floor, the schedule is priced as carefully as the build. A quote that ignores your operating hours is not cheaper, it is incomplete.

Tell us about the floor.

Area, what happens on it, and the hours you cannot lose. On a working site that last one shapes the answer as much as the size.

Square footage of the area to be coated.

What runs across the floor, your operating hours, and whether a previous coating has failed.

We reply by email. Read how requests are handled in our privacy notice.

Start to finish

What our epoxy flooring process looks like in Concord

Replacing a floor that is already in use asks two questions a fresh installation never does: why did the last one fail, and how does the work happen without stopping the operation.

  1. Find out what went wrong

    A floor that has lifted, worn through or gone powdery is telling you something about how it was prepared or specified. Identifying that first is what stops the replacement repeating it.

  2. Measure the operation, not just the floor

    Traffic, shift patterns, which aisles cannot close and what has to keep moving. On a working site this shapes the programme, and the programme shapes the price.

  3. Specify the build and the phasing together

    System, thickness and marking, alongside the section plan and the working windows. Presenting them as one document is the only way the trade-offs between them stay visible.

  4. Install by section, hand back by section

    Each area is prepared, built and released on its own timetable, so the site is never entirely out of use and the last section hands over with the whole floor documented.

Removing a failed floor is frequently the largest line in a Concord quote, and it is the hardest to price from a description. Where there is real doubt about how well the existing coating is bonded, a test area answers it far more cheaply than discovering it across ten thousand square feet.

Why us

Why choose us for epoxy flooring in Concord

Replacing a floor on a site that cannot stop is a different exercise to installing one on a site that is empty.

  • Diagnose first

    A replacement should not repeat the original

    Coatings that fail usually fail for a reason that is still present: preparation that never opened the concrete, a build too thin for the traffic, or a moisture problem nobody tested for. Working out which one applies costs very little and is the difference between a floor that lasts and an expensive rerun.

  • Downtime is the real number

    Not the price per square foot

    For most operations here a day of lost production or trading costs more than the difference between a cheap quote and a good one. That makes the programme part of the specification, and it is why fast-cure materials often pay for themselves several times over on a working site.

  • Removal at scale

    The line that moves most

    Taking a failed coating off a large floor is slow, dusty work, and how slow depends entirely on how well it is stuck. That is genuinely difficult to judge from photographs, so on a large area it is worth grinding a test patch before the number is fixed rather than carrying a wide contingency.

Questions we actually get

Concord questions.

Our floor was coated a few years ago and it is already failing. Why?
Most often because the concrete was never mechanically opened before the coating went on, so it was sitting on the surface rather than keyed into it. The other common causes are a build specified too thin for the traffic and moisture that was never tested for. Which one it was matters, because a replacement that does not address it will go the same way.
Can the work happen without shutting down?
Usually. The floor is divided into sections with each released as it cures, so there is a working route throughout. What we need from you is certainty about which section can be cleared on which day, because a section that cannot be emptied stalls everything behind it.
How do you price removal when nobody knows what is under there?
By testing rather than guessing. A small area gets ground before the quote is finalised, which shows how well the existing coating is bonded and how many passes it takes to get through. On a large floor that half hour removes the biggest unknown in the price.
Is it cheaper to patch the bad areas than replace the floor?
Sometimes, and it depends on why the bad areas are bad. Localised damage in an otherwise sound floor patches well. Failure spread across the floor is usually a symptom of the original preparation, in which case patching buys months rather than years. We will tell you which one you have.
Do you work nights and weekends?
Regularly, and on occupied sites it is often the default. Off-hours labour carries a premium and it almost always costs less overall than the operating hours it saves. Where both are workable the quote shows the two options side by side.
We also have an office and a washroom in the unit. Same floor?
Rarely worth it. Those areas see a fraction of the traffic, so specifying them to the warehouse standard is a straightforward way to overspend. They get quoted as separate areas at whatever they actually need.

Get a working floor quoted with the downtime in it.

Send the area, what runs across it and the hours you cannot lose. The build and the programme come back together.