Polyaspartic is not a better epoxy, it is a different trade-off. It cures in hours instead of days, tolerates a slab far colder than epoxy will accept, and holds its colour in sunlight rather than going amber. What you pay for that is a shorter working time in the pail and a higher material cost, which is a good deal on some floors and a waste of money on others.

Where epoxy is the better buy for your floor, the quote will say so and price both. Fast is only worth paying for when the calendar needs it.

Tell us about the timing.

The date you need the floor back matters as much as its size here. Both go into which chemistry gets quoted.

A car count or a square-foot figure both work.

The date you need it back, whether the space can be heated, any existing coating.

We reply by email. Read how requests are handled in our privacy notice.

One-day sequence

What Our Process Is

A single-day install only works if the slab suits it. The first stage exists to establish that honestly, before a date gets promised to anyone.

  1. Confirm the floor suits one day

    Heavy repair, deep salt damage or a thick failed coating all add grinding hours that a single day cannot absorb. Where that is the case, we say so at quoting instead of running out of daylight on site.

  2. Book a single window

    The whole install lands in one date rather than spread across a week. That is the actual product here, and it is worth planning the rest of the week around.

  3. Grind in the morning, coat in the afternoon

    Preparation and repair run first thing, then base and broadcast, then the clear coat late in the day while the previous layer is still inside its recoat window. Pot life is short, so the crew size is set to the floor area rather than the other way round.

  4. Back in service next morning

    Foot traffic is typically fine the following day and vehicles within a few days. You still get all three dates in writing, because they move with the temperature the floor was installed at.

The compressed timeline is exactly why the preparation cannot be compressed with it. Grinding time is the same whichever chemistry follows it, and a one-day install that skipped it is just a fast failure.

What we install here

Other Services We Provide in Woodbridge

Polyaspartic is a topcoat chemistry rather than a room. It appears inside most of the builds below, and which one you end up with depends on the floor rather than the label.

Why us

Why Choose Us

Three reasons this chemistry gets specified, and one honest reason it sometimes should not be.

  • Cold weather

    A wider installation window

    Polyaspartic tolerates a slab several degrees colder than epoxy will accept, which turns a number of Woodbridge garages from a spring booking into a February one. The slab still has to be above dew point and the space still needs to hold temperature through the cure, but the usable window is genuinely longer.

  • UV stability

    The strip by the door stays put

    Standard epoxy ambers where daylight reaches it, which in a garage means a visible band inside the door that grows more obvious every summer. Polyaspartic holds its colour, so the floor by the opening still matches the floor at the back in three years.

  • Honest fit

    Sometimes epoxy is the right answer

    Material costs more per litre and the pot life is short enough to punish a slow crew, so on a floor with no schedule pressure and no daylight on it, epoxy delivers the same result for less. Where that is your floor, the quote prices both and explains which we would choose.

Questions we actually get

Woodbridge polyaspartic questions.

Is it genuinely one day, or one day plus a return visit?
For a typical garage on a sound slab, genuinely one day: grinding in the morning, coats in the afternoon, off the floor by evening. What breaks that is preparation, not coating. A floor needing extensive repair or the removal of a thick old coating will run into a second day, and you will be told that at quoting rather than at four o'clock.
Does it cost more than epoxy?
The materials do, noticeably. The installed difference is smaller than the material difference because the labour is compressed into fewer days. Whether it is worth it comes down to what the downtime is worth to you, which is a different answer for a home garage than for a service bay.
Will it yellow like epoxy does?
No. UV stability is one of the main reasons it gets specified. That said, the clear coat is what carries that property, so a polyaspartic topcoat over an epoxy base still protects the colour underneath. Hybrid builds like that are common and often the best value.
Can you really install in December?
Often, yes, which is the practical advantage. The limits are still real: the slab has to be above dew point and above the material minimum, and it has to stay there through the cure. In an unheated garage that usually means bringing heat in. When the numbers do not work, we book it for later rather than gamble.
Is polyaspartic more brittle than epoxy?
It is generally more flexible, not less, which helps it ride out slab movement and impact. The trade-off sits elsewhere, in the working time: it goes off fast, and that punishes a crew that is not set up for it. That is a scheduling and staffing problem rather than a product weakness.
Can you put a polyaspartic topcoat over my existing epoxy floor?
If the existing floor is sound and well bonded, yes, and it is a good way to refresh a tired but healthy floor. It has to be abraded first so the new coat has something to key into. If the existing floor is lifting anywhere, recoating locks a failure underneath a new surface and the honest answer is removal instead.

Find out if your floor suits a one-day build.

Send the floor, its condition and the date you need it back. Both chemistries get priced where both are viable.

Request a written quote

Free written quoteVaughan & York Region

Get a quote