Commercial units · Woodbridge

Commercial epoxy flooring in Woodbridge

The employment lands running through Woodbridge along Highway 7, Martin Grove and Rowntree Dairy hold a particular kind of building: mid-size units with a trade counter at the front, a shop or warehouse behind, and no realistic way to close for a week. Almost every floor out there is quoted around the operating hours rather than the square footage, and the schedule is the hard part of the job.

Commercial quotes carry the slip rating, the line marking and the phasing plan as named items, so the operations side can be signed off separately from the price.

Tell us about the unit.

Floor area, what runs across it and the hours you cannot lose. The phasing plan comes back with the number.

Square footage, or bay count for a service shop.

Traffic type, forklift weights, shift hours, any coating already down, target dates.

We reply by email. Read how requests are handled in our privacy notice.

Commercial sequence

What Our Process Is

The specification is the easy half. What takes the planning is fitting an install around a business that has to open on Monday.

  1. Walk it while it is running

    The site visit happens during working hours on purpose. Traffic patterns, where the pallet jacks turn and which bay never empties tell us more about the build than an empty floor would.

  2. Agree the phasing

    The floor gets divided into sections with a sequence and a cut line for each. Nights, weekends and shutdown weeks all work; what does not work is finding out on day two that a section cannot be cleared.

  3. Specify, not assume

    The quote names the system, the film build, the slip rating for wet areas and any line marking or bay numbering, with the cure chemistry chosen to hit the return-to-service time the schedule needs.

  4. Install and hand back per section

    Each section is ground, built and released on its own timetable, so the unit is never fully out of use and the last section hands back with the whole floor documented.

Fast-cure materials cost more per litre and buy back far more than that in downtime. Where a bay has to take traffic the next morning, the material choice is made by the schedule and the quote says so openly.

What we install here

Other Services We Provide in Woodbridge

A commercial site usually has more than one floor condition in it. Each one is priced on its own merits rather than averaged into a single rate across the building.

Why us

Why Choose Us

Three things separate a commercial floor that survives a year of traffic from one that gets patched every quarter.

  • Phasing

    The unit keeps trading

    Sections, cut lines and off-hours starts are planned before the first machine arrives, and each section hands back on its own clock. Closing a Woodbridge unit for a week costs more than the floor does, which is why the schedule is designed first and the price follows it.

  • Slip rating

    Specified, not assumed

    A wet trade counter and a dry warehouse aisle want different surfaces, and a glossy floor that photographs well is a liability at an entrance in February. The aggregate and the finish are named in the quote so the choice is documented rather than left to whoever holds the roller.

  • Point loads

    Racking legs and pallet jacks

    Traffic wears a floor evenly. Racking legs, jack wheels and dropped steel do not, and they are what actually breaks a thin build. Film thickness is set against the heaviest thing that crosses the floor, not the average.

Questions we actually get

Woodbridge commercial questions.

Can you work overnight or on weekends?
Yes, and for occupied units it is usually the default. Off-hours work carries a premium on labour and it almost always costs less overall than the trading days it saves. The quote shows both options where both are workable.
Do we have to shut down completely?
Rarely. Most units are done in sections, with a working aisle maintained throughout. What we do need is a firm commitment about which section is clear on which day, because a section that cannot be emptied stalls the whole sequence.
Can you put down line marking and bay numbers?
Yes. Aisle lines, safety striping, bay numbering and hatched exclusion zones are applied within the build rather than painted on top afterwards, so they wear at the same rate as the floor around them.
Will it hold up to forklift traffic?
That depends on the build, which is why forklift weight and wheel type are asked about at quoting. Hard polyurethane wheels under a loaded counterbalance truck concentrate a lot into a small contact patch, and the film thickness is set for that rather than for foot traffic.
Our service bays are soaked in oil. Is that a problem?
It is the most common problem in an auto shop, and it is solvable. Oil that has soaked into the slab has to be drawn out and the concrete degreased before grinding, otherwise the coating sits on contaminated substrate. Badly saturated areas sometimes need the top layer taken off entirely, which is assessed before quoting.
Can you coat a mezzanine or a loading dock?
Both. A mezzanine deck is usually a thinner build since it carries less, and an exterior dock is a different conversation because it takes UV, freeze-thaw and plow damage. Dock aprons get quoted as their own line with their own expected life.

Get your unit specified and phased.

Send the floor area and the hours you cannot lose. The system, the phasing plan and a price range come back in writing.

Request a written quote

Free written quoteVaughan & York Region

Get a quote